Well the right side of the house has had the bricking complete. Only thing left is the garage to be finished & the sheeting that goes on the bk of the house. Bi fold doors to go in & we are then at lock up!
Did a quick scan and all items from the NHI report with framing has been fixed. Thanks to my SS :-)
The ducted vac points have also been installed 3 downstairs (in lounge, living & rumpus, sweeper in kitchen) with the sweeper & 2 upstairs (next to linen cupboard & in master bedroom)
Only thing that I can c that needs fixing is my entry light switch to the master bedroom needs to be wired to the entry as it's currently wired to the balcony light switch lighting.
Pretty happy, can't wait for the plaster to go up! Hopefully insulation goes in next week & we r at lock up!
Mel