Went and did my usual weekend visit!
Bricking is still happening.
Electrical has all been done. Took my plan & pretty much 99% to plan. Very happy ;-)
Also noticed that they have put in one ducted vac point upstairs, bath hob has started.
And we had NHI out last Wk & the report wasn't to bad. My SS has gotten onto all items. Lots of pink spray with notes for the carpenter to fix. Rapt he is onto it!
See some pics below:

Ducted vac point

Heating & cooling pipes!

Pink paint on some framing that needs correction.

Bath hob begins!

Electrical work at front entry/ study!